Memo
To: BP Project Manager
From: Brandon Tran
CC: Jennifer Ogo
Date: November 19, 2013
Subject: Seismic Exploration Results/Findings
The methods we used to find the points on the drills because they used a seismograph to measure the sounds and then they would measure the waves from earthquakes to find the points to drill. I propose that the spot to drill is C1 because it is the lowest number. The depth required to drill to reach the reservoir is
From: Brandon Tran
CC: Jennifer Ogo
Date: November 19, 2013
Subject: Seismic Exploration Results/Findings
The methods we used to find the points on the drills because they used a seismograph to measure the sounds and then they would measure the waves from earthquakes to find the points to drill. I propose that the spot to drill is C1 because it is the lowest number. The depth required to drill to reach the reservoir is